Beijing Zhongke Environmental Testing High Quality High and Low Temperature Damp Heat Test Chamber Manufacturer
Product use: It is an essential testing equipment in aviation, automotive, home appliances, scientific research and other fields, used to test the temperature environment parameters and performance of electronic, electrical and other products and materials for high temperature, low temperature, humidity or constant tests.
1、 Product specifications and parameters
PRODUCT MODEL | GDS-010 | ||||
Internal dimensions: D × W × Hmm | 1000×1000×1000 | ||||
Dimensions: D × W × Hmm | 1650×1420×2100 | ||||
temperature range | 0℃~150℃ | -20℃~150℃ | -40℃~150℃ | -60℃~150℃ | -70℃~150℃ |
Humidity range | 30%~98% R.H | ||||
temperature fluctuation | ≤±0.5℃ | ||||
temperature uniformity | ≤±2℃ | ||||
Humidity fluctuation | +2- 3%R.H | ||||
heating rate | 1.0~3.0℃/min | ||||
cooling rate | 0.7~1.2℃/min | ||||
Time setting range | 0-9999 hours | ||||
Power requirements | AC380 (± 10%) V/50HZ/AC380 (± 10%) V/50HZ three-phase five wire system | ||||
Power | 8.5KW | 9.5KW | 11KW | 11KW | 12KW |
Total weight of equipment | 300KG | 330KG | 350KG | 350KG | 380KG |
Load carrier (standard) | 2 pieces |
Beijing Zhongke Environmental Testing High Quality High and Low Temperature Damp Heat Test Chamber Manufacturer
2、 Box material:
1. The shell is processed and formed using high-quality steel plate CNC machine tools, and the surface of the shell is treated with anti-static spray coating, making it more smooth and beautiful;
2. The inner liner is made of high-quality SUS304 mirror stainless steel plate;
3. High density glass fiber cotton is selected as the insulation material, with a thickness of 100mm for the insulation layer;
4. The temperature and humidity circulation system adopts a specially designed low-noise long axis fan motor with stainless steel multi blade impellers that are resistant to high and low temperatures, to achieve strong convection and vertical diffusion circulation;
5. A double-layer high-temperature resistant high tensile sealing strip is used between the door and the box to ensure the sealing of the testing area;
6. Adopting non reactive door handles makes operation easier;
7. The bottom of the machine adopts high-quality fixed PU movable wheels;
8. The observation window adopts multi-layer insulated tempered glass, and the inner side is coated with laminated conductive film for heating and defrosting (clearly observe the test process);
9. The test hole (on the left side of the machine) can be used for external testing power or signal lines (the aperture or number of holes needs to be increased and indicated);
3、 Control system:
1. Adopting the Korean imported "TEMI300" high-precision digital temperature and humidity control instrument, P.I.D high-precision control, to eliminate long-term unstable operation;
2. Humidity is controlled through intuitive display, eliminating the shortcomings of the original temperature and humidity comparison;
3. Accuracy: ± 0.1 ℃ (display range);
4. Resolution: ± 0.1 ℃;
5. Temperature sensor: PT100 platinum resistance tester;
6. Control mode: Thermal balance temperature regulation mode;
7. Electrical control: The main components of the electrical control system use imported "Schneider" and "Merlin Gerin" components to better control temperature;
8. The return air outlet of this test chamber is equipped with an automatic defrosting device (so that the water vapor generated during the test will not accumulate on the refrigeration evaporator and cause ice blockage);
4、 Heating system:
1. Adopting far-infrared nickel alloy high-speed heating electric heater;
2. The high-temperature system is completely independent and does not affect the low-temperature test or wet heat test;
3. The output power of temperature and humidity control is calculated by a microcomputer to achieve high-precision and high-efficiency electricity efficiency;
5、 Humidification system:
1. Built in boiler steam humidifier;
2. Equipped with automatic water level compensation and water shortage alarm system;
3. Far infrared stainless steel high-speed heating electric heating tube;
4. The humidity control adopts P I.D +S.S.R, Coordinate and control the system with the same channel;
6、 Refrigeration system:
1. Compressor: Fully enclosed original French Taikang unit;
2. Cooling method: single (double) mechanism cooling (air-cooled type);
3. Condensation method: forced air cooling;
4. Refrigerants: R404A, R23 (environmentally friendly);
5. All system pipelines undergo a 48 hour leak detection test with ventilation and pressurization;
6. The heating and cooling systems are completely independent;
7. Internal spiral refrigerant copper tube;
8. Slope evaporator;
9. The dry filter, refrigerant flow window, repair valve, oil separator, solenoid valve, and storage tank are all imported original parts;
10. Dehumidification system: using evaporator coil dew point temperature laminar contact dehumidification method;
11. Start R404A when cooling down R23, Only start R404A during dehumidification (energy-saving and consumption reducing);
7、 Protection system:
1. Fan overheating protection;
2. Overall equipment under phase/reverse phase protection;
3. Overload protection for refrigeration system;
4. Refrigeration system overpressure protection;
5. Overall equipment timing;
6. Overheating of the water pump and overcurrent protection;
7. Other protections include leakage, water shortage, operation indication, automatic shutdown after fault alarm, etc;
8、 Equipment usage conditions:
1. Environmental temperature: 5 ℃ to+28 ℃ (average temperature within 24 hours ≤ 28 ℃)
2. Environmental humidity: ≤ 85%R.H
3. The operating environment requires good indoor ventilation, and no objects should be placed 80 centimeters in front, back, left, right, or right of the machine;
9、 Compliant with standards: Designed and manufactured strictly in accordance with relevant standards such as GB/T10592-2008, GB/T10586-2006, GB/T2423.1-2008, GB/T2423.2-2008, GB/T2423.3-2006, etc;
10、 Service commitment: Free home delivery. After the installation and debugging of the equipment is completed, relevant technical personnel will receive free operation training at the user's site, with no limit on the number of people.