China Railway Construction Heavy Industry Group Co., Ltd
Home>Products>Digital lining trolley
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
  • Address
    No. 88 Dongqi Road, Changsha Economic and Technological Development Zone, Hunan Province, China
Contact Now
Digital lining trolley
The digital lining trolley is a specialized equipment for tunnel secondary lining construction, which can be widely used in various fields such as rai
Product details
Product Features

1. Double pouring efficient construction

Unique dual pouring system, remote control layer by layer and window by window pouring, can complete the switching of upper and lower pipelines in just 10 minutes, with fast pouring speed. The operation time for one ring and two lining is 8-10 hours.

2. High frequency compaction vibration

High frequency pneumatic vibrator, with a wide vibration range and large depth, works in conjunction with airbag plugs to effectively prevent grout leakage from the end formwork and compact the concrete during vibration;

The arch has dual monitoring of signal feedback and pressure detection to ensure that the arch is filled to the required level.

3. Highly integrated informatization

Equipped with liquid level display, mold temperature monitoring, dome filling reminder, and alarm information functions, and capable of recording, storing, and transmitting construction data.

4. Save manpower and material resources

Only one operator can complete the entire machine fabric, and the pipeline after pouring is quickly cleaned with sponge balls, which is fast and convenient. 4-6 people can complete the construction of the first ring and second lining.


Product parameters

project

unit

parameter

CQS12

Standard type

CQS12G

Intelligent

Whole machine weight

kg

160000

complete machinesize: Long×wide×tall

mm

12100×13400×9945

Electric Generalpower

kW

97

Walking style

/

Rail type (automatic rail feeding)

Maximum driving speed

m/min

4

Stencil thickness

mm

10

Template width

mm

2000

Net space for opening to traffic (width)×High)

m

3.9×4.5

Theoretical lining length for one work cycle

m

12

Theoretical pumping displacement of lining concrete

m³/h

40

Theoretical pouring time of one ring concrete

h

8

Conveying pipeline diameter

mm

125

Pressure pouring system

/

Double pouring technology

Automatic vibration system (optional)

/

High frequency pneumatic

Intelligent monitoring system (optional)

/

Configure computers, sensors, etc


Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!