The structure of the feed grinder consists of a grinder, a screw belt mixer, a winch hoist, a screw conveyor, and a bag dust removal device.
The process flow of feed crusher: preparation → measurement → crushing treatment → mixing treatment → conditioning treatment → pressing particles → finished product, which is packaged and stored.
So, what issues should be paid attention to during the operation of the feed grinder? Firstly, it is necessary to ensure the provision of suitable voltage, while also paying attention to controlling the moisture content of raw materials and operating according to the prescribed requirements. First, run the production equipment in an unloaded state for a while. When there is no abnormal noise from the equipment, adjust the motor to the correct direction, stop the machine for production preparation, and tighten the dust bag.
Then add the raw materials in proportion according to the formula requirements, start the feed crusher for crushing, and wait until the raw materials are crushed smoothly before turning off the crusher power. After completing the granulation work, the feed crusher should be shut down in a timely manner and the site should be cleaned up in a timely manner.