The product is a customized product, and the above quotation is a deposit
overview
With the rapid development of industry, the application of lead and lead alloy industries has also increased, inevitably producing smoke and lead gas, and causing toxicity and environmental pollution to the human body. As is well known, long-term exposure to lead concentration isGases above 0.05 milligrams per cubic meter can cause poisoning. For this purpose, our factory has produced YJQY lead and lead alloy industry lead fume purifiers. This lead smoke purifier is suitable for purifying lead smoke and exhaust gas generated in the printing industry, smelting industry, pharmaceutical industry, battery storage manufacturing industry, automobile and tractor water tank manufacturing industry, as well as in the production process. It is also suitable for treating acid mist gas, zinc containing gas, and oil vapor in lead vapor.
technological process
The large amount of lead dust generated during the smelting process of lead is mainly composed of lead cyanide. The exhaust gas is attracted by the fan, passes through the exhaust hood and pipeline, and enters the purifier. It collides, wets, diffuses, and washes the absorption liquid sent by the pump to remove lead dust and other substances and gases from the lead gas. Then, the clean gas is discharged into the atmosphere through the fan, duct, and hood. And the absorption liquid still returns to the water tank, where it passes through inclined pipes, filter screens, and other functions to clarify impurities in the absorption liquid. Lead containing exhaust gas can achieve the above effects, enabling the workshop toThe hygiene standards for industrial enterprise design stipulate that the purified lead mist gas meets the requirements of the Comprehensive Emission Standards for Air Pollutants.
Precautions for handling and installation
1. When transporting, be sure to lift and place gently, strictly prohibit collision and knocking, and not be squeezed by other heavy objects
2. The support must be firmly installed on the steel bracket during installation The equipment is required to be vertical, with an inclination of ≤ 0.010.3 of the total length of the pipes. The connected iron pipes should be fixed with pipe racks and should not be supported on plastic pipe openings or flanges. When connecting the connecting flanges externally, forced installation is not allowed When installing the flange bolts, they should be operated evenly, symmetrically, and slowly, and no violence should be applied to avoid damaging the equipment.
Contact: Manager Yao mobile phone:18831897799