Hebei Sanyang Shengye Fiberglass Group Co., Ltd
Home>Products>Manufacturer of acid mist purification tower
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    18831897799
  • Address
    No. 189 Fuqiang North Road, Zaoqiang County
Contact Now
Manufacturer of acid mist purification tower
Considering that the main pollutants of pharmaceutical factories have already been listed, according to the emission standards in the formulation basi
Product details

The product is a customized product, and the above quotation is a deposit

overview

During the production of drugs, pharmaceutical factories mainly produce two volatile organic compounds, acetone and ethanol, as well as nitrogen oxides. However, during the wastewater treatment process, a foul odor is generated, mainly composed of hydrogen sulfide.

Governance principles

1. According to relevant national and local environmental laws, regulations, and industrial policies, industrial pollution should be controlled to fully leverage the social, environmental, and economic benefits of construction projects.

2. Properly address the pollutants generated during project construction and operation to avoid secondary pollution.

Governance objectives

Given that the main pollutants of pharmaceutical factories have already been listed, according to the emission standards in the formulation basis, each project should meet the national second level emission standards.

Precautions for use

1. It should be used within the temperature, pressure, and medium range specified in the drawing, and should not exceed the temperature and pressure limits

2. When using, the material must first be introduced into the pipe through a coolant If the material temperature is too high, heat exchangers should be added before and after the absorber

3. The coolant must be clean and free from impurities such as mud, water plants, etc. to avoid blocking the passage If necessary, a filter can be added to remove impurities from the water. When stopping work in winter, the cooling water outside the clean pipe should be immediately drained to prevent freezing damage

4. Always pay attention to whether there is any collusion between the materials inside and outside the pipe. Once it occurs, immediately detect the leaking pipe and replace it in a timely manner After maintenance, the equipment can only be used after pressure testing.

Contact: Manager Yao mobile phone:18831897799

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!