[Main purpose]:
1. Pharmaceutical: Raw material crushing, wet material granulation, dry material granulation, non compliant tablets, and those that need to be recycled can be whole according to particle size.
2. Food: such as biscuits, Dim sum, etc.
3 Other: Grinding and granulation of coarse raw materials, block shaped raw materials, agglomerates, and clumped raw materials.
[Working principle]:
After the processed raw materials enter the feed inlet of the crushing and granulating machine, they fall into the conical working chamber. The rotating rotary knife exerts a swirling effect on the raw material, and the particles are thrown towards the screen surface by centrifugal force. At the same time, the high-speed rotation of the rotary knife produces a shearing effect with the screen surface, and the particles are crushed into small particles between the rotary knife and the screen and discharged through the screen. The size of the crushed particles is adjusted by the number of sieves, the distance between the rotary blade and the sieve, and the speed of rotation.
[Technical Parameters]:
model | Production capacity (kg/h) | Particle size (mesh) | Transmission seat temperature rise (℃) | Speed range (rpm) | Motor power (kw) | Dimensions (mm) Length x Width x Height | Height from discharge outlet to ground (mm) |
150 type | 15-150 | 6-80 | <30 | Single speed 2800 Frequency Control 300-3600 |
1.5 | 810×445×1345 | 650 |
300 type | 30-300 | 6-80 | <30 | 1.5 | 810×445×1345 | 650 | |
450 type | 45-450 | 6-80 | <30 | 2.2 | 920×445×1430 | 690 | |
700 type | 70-700 | 6-80 | <30 | 3 | 1000×500×1530 | 690 | |
Type 100 | 100-1000 | 6-80 | <30 | 5.5 | 1100×5600×1785 | 565 |
[Service Commitment]
Design and production
Our company extensively solicits opinions from the demand side during the design and production stages of equipment processing, especially in the layout of flat and vertical surfaces, fully considering the site conditions and public engineering conditions of the demand side, so as to ensure the quality of the equipment while optimizing the combination.
Installation and commissioning
When the equipment arrives at the buyer's factory, our company will send dedicated technical personnel to guide the installation and be responsible for debugging to normal use.
training
Before the equipment is used normally by the demand side, our company's debugging personnel will organize training for relevant personnel of the demand side. The training content includes equipment maintenance, upkeep, timely repair of common faults, and operating procedures for the equipment.
quality assurance
Our company's equipment warranty period is one year. During the warranty period, if the equipment is damaged due to non-human factors, we are responsible for free maintenance. If the equipment is damaged due to human factors, our company will promptly repair it and charge a cost fee.
Maintenance and Deadline
Equipment damage that occurs upon expiration of the warranty period shall be repaired on site within two days by enterprises within the province and within four days by enterprises outside the province upon receiving notification from the purchaser. The services provided upon expiration of the warranty period are paid services, and a production fee shall be charged for each service.
Service Commitment
Our company promises to provide lifelong guidance, maintenance, and service for all equipment.