On December 1, 2017, the National Energy Administration made corresponding adjustments to the qualification equipment for power testing. The qualification equipment for testing in each province and region is the same, and some equipment that is not commonly used by power enterprises in actual work is omitted. Huatian Power briefly introduced the new version of the construction equipment selection guide for the third level power facility license for installation (repair, testing) testing.
Obtaining a third level installation (repair, testing) license, one can engage in the installation, maintenance, or testing activities of power facilities with voltage levels below 110 kV.
To learn about the application materials and filling specifications for the installation, maintenance, and testing of power facility licenses, you can click on "Application Specifications" to browse.
Product nickname: Level 3 testing instrument, Level 3 testing equipment, Testing instrument equipment, Level 3 testing configuration table, Level 3 testing equipment, Level 3 testing and inspection equipment selection table.
Serial Number | Name of experimental equipment | unit | quantity | specifications | model |
one | High voltage generating equipment | ||||
1 |
DC high voltage generator |
cover | 1 | DC:200kV/3mA | ZGS-200kV/3mA |
cover | 1 | DC:120kV/2mA | ZGS-120kV/2mA | ||
2 |
Power frequency withstand voltage test device |
cover | 1 | AC:10kVA/100kV | GYD-10kVA/100kV |
cover | 1 | AC:5kVA/50kV | YDJ-5kVA/50kV | ||
3 | Complete set of equipment for frequency conversion series resonance test | cover | 1 | 500kVA/200kV/2.5A, 30-300Hz |
XZB-500kVA/200kV |
4 | Induction voltage withstand test device | cover | 1 | 5kVA/360V, 150Hz | SFQ-5kVA/500V |
two | Electrical measuring instruments | ||||
1 |
High voltage dielectric loss tester |
tower |
2 |
1. The accuracy of medium measurement is 1% 2. The capacitance accuracy is 0.5% 3. Anti interference frequency conversion |
JS-H |
2 | Loop resistance tester | tower | 2 | DC:≥100A | HLY-100A |
3 | Transformer volt ampere characteristic tester | tower | 1 | 1100V/5A | FA-103 |
4 | Ground Resistance Tester | tower | 1 | Frequency difference method | JD-H |
5 | Capacitance and inductance tester | tower | 1 | RG-H | |
6 | Grounding continuity tester | tower | 1 | DC:1A | DT-10A |
7 | Transformer DC resistance tester | tower | 2 | DC:≥10A | ZZC-10A |
8 | Transformer ratio tester | tower | 1 | Digital 0.5 level | BBC-H |
9 | Transformer winding deformation tester | tower | 1 | Frequency response method | RBX-H |
10 | Load tap changer tester | tower | 1 | I≥1A | BYKC-3000 |
11 | Circuit breaker characteristic tester | tower | 2 | GKC-H | |
12 | Zinc oxide lightning arrester resistive current tester | tower | 1 | BLC-H | |
13 | Three phase relay protection tester | tower | 1 | Two sets of three-phase voltage and current each | HY331 |
14 | Lightning strike counter calibrator | tower | 1 | FD-III | |
15 | insulation resistance tester | tower | 2 |
DC:0~10000V 200G(Ω) Short circuit current ≥ 5mA |
GM-10kV |
three | Oil and gas experimental instruments | ||||
1 | SF6 leak detector | tower | 1 | Sensitivity 1ppmv | XP-1A |
2 | SF6 gas micro water tester | tower | 1 | WS-2 | |
four | Common Instrument List | ||||
1 |
Megger | only | 1 | DC:2500V | DMG2671 |
2 | Megger | only | 1 | DC:500V | DMG2670 |
3 | Digital dual clamp phase voltmeter | only | 1 | Measure current 1mA~5A | SMG2000E |
Note:1. The appearance of the product is subject to the actual product. Technical parameters and models are subject to change without prior notice. If there is any act of theft or copying, legal responsibility will be pursued
2. To learn more about Huayi products, please enter the product center. Service Hotline:
Those who have obtained the third level testing license for the installation (repair, testing) of power facilities can undertake the testing of transmission, power supply, and power receiving facilities below 110 kV. The applicant for the license for the installation (repair, testing) of power facilities in the third level testing category shall meet the following conditions:
(1) Having legal personality and a well-established organizational structure;
(2) Having more than 2 consecutive years of testing experience in undertaking power facilities of 110 kV or above, or having more than 4 consecutive years of testing experience in undertaking power facilities of 10 kV or above;
(3) The registered capital shall not be less than 10 million yuan, and the net assets shall be more than 12 million yuan;
(4) The technical leader has more than 5 years of experience in power facility testing management and holds a professional technical qualification of power engineering or above;
(5) Having no less than 40 technical and economic professionals (including senior technicians, technicians, and senior engineers), including no less than 20 senior engineers, engineers, and engineering technicians in the field of electrical engineering;
(6) Establish a safety management organization, with safety engineers holding professional technical qualifications at or above the level of electrical engineering engineer; At least one full-time safety supervisor shall be appointed;
(7) Having a fixed business premises with a total area of not less than 800 square meters, and equipped with various professional laboratories and testing equipment capable of testing transmission, power supply, and power receiving facilities with voltage levels below 110 kV;
(8) Having a sound technical archive management system;
Product Attachment Diagram
-
Huayi Electric Power specializes in the research and development of power installation and testing equipment
-
Huayi Electric Power specializes in the research and development of power installation and testing equipment
-
Huayi Electric Power specializes in the research and development of power installation and testing equipment
-
Huayi Electric Power specializes in the research and development of power installation and testing equipment