product details

2. Familiar with the equipment installation diagram.
3. First, fix the water outlet connected to the decanter and weld the flange according to the drawing requirements. The center of the flange must be perpendicular to the center of the upper machine base, and the end face of the flange must ensure the levelness and balance of the machine. The flange eye holes must be symmetrical as required.
4. Fixed machine base. First, find the centerline perpendicular to the center of the water outlet pipe, opposite to the center of the machine base, correct the balance of the machine base, align the inner plane with the flange end face on the same parallel line, and then fix and weld to ensure the corresponding strength.
5. Install mechanical transmission devices. Connect the mechanical transmission device with a shaft sleeve, fix it on the machine base with bolts, correct its balance and verticality, and tighten the connecting screws.
6. Assemble the decanter in the reaction tank, connect and fix the flange of the outlet pipe of the decanter with the flange of the outlet pipe of the tank body with bolts, lift the decanter to a certain height, and connect the support point of the decanter and the push rod of the mechanical transmission component with a connecting rod.
7. Install the machine distribution cabinet. The electrical cabinet should be fixed on the side of the mechanical transmission component with a spacing of 200-400mm, and connected to the control line of the mechanical transmission component according to the requirements of the drawing.
8. Use a temporary power source to start the decanter, run it forward to the lowest point of the decanting height (according to the process design requirements of the reaction tank), stop, open the lower inspection window of the mechanical transmission component, adjust the lower limit travel switch contact to the stop position and fix it. Restart the reverse operation and reach the standby height of the decanter (300mm from the highest water surface of the reaction tank at the weir mouth of the decanter). Open the inspection window on the upper part of the mechanical transmission component and adjust the contact of the upper limit travel switch to the stop state.