Shenzhen Rongde Robot Technology Co., Ltd
Home>Products>Drill bit fully automatic spraying mobile phone cable
Drill bit fully automatic spraying mobile phone cable
Drill bit fully automatic spraying mobile phone cable
Product details

The automatic spray painting line for drill bits adopts a spindle production line, with fixed spray gun adjustment (up and down, front and back, angle adjustment), which can adjust high and low, as well as multiple angles. Suitable for oily paints, spray guns and pumps are suitable for testing and general use, if needed due to changes in process, product, paint, etc. in the future.

1. Automatic spray painting production line conveyor system
Specifications and dimensions: L175000 * H750 ± 20mm
Purpose: Transport of spray painted products. The conveying method adopts continuous or step-by-step conveying, and the workpiece rotates 360 degrees. Specialized chain that can change direction 360 degrees, saving space, and running smoothly with even rotation.

2. Automatic anti-static cabinet
Specifications and dimensions: L1200*W2200*H2000mm
Purpose: Automatic static electricity removal and electrostatic dust removal before spraying, improving product quality.

3. Water curtain washing spray paint cabinet
Specifications and dimensions: L3000*W2400*H2000mm
Purpose: Spray painting purification equipment, using the Wenqiu principle to wash paint, with good paint removal effect.

4. Adjustable fixed gun rack, fixed spray gun adjustable (up and down, front and back, angle adjustment), capable of high and low, and multi angle adjustment.
5. Spray and oil supply: Suitable for oily paints, spray guns and pumps are suitable for testing and general use. If necessary due to changes in process, product, paint, etc. in the future.

6. Leveling section
7. Curing oven: Drying the paint on the surface of the workpiece, specifications and dimensions: L6300 * W4400 * H1900mm, single-sided coating infrared heating tube 120KW, strong radiation ability, high heating efficiency, and energy saving. The heating time for an empty furnace is about 30 minutes.

8. Operation room (CJ151): Painting operation area, dust-proof isolation is implemented. Purification single door: W750*H1980mm, Equipped with windows W300 * H500mm; Observation window: Specification L2000 * W1000, with 5mm thick transparent glass in the middle.

9. Electrical part
Purpose: Centralize control of electrical appliances and directly view spraying data.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!