Shanghai Fuxin Pump Valve Co., Ltd
Home>Products>KJB corrosion-resistant and particle resistant centrifugal pump
KJB corrosion-resistant and particle resistant centrifugal pump
The KJB series corrosion-resistant and particle resistant centrifugal pump has a plastic body molded as a whole, which is reliable and thick. It is su
Product details

KJB corrosion-resistant and particle resistant clamp plate pump has stable operation and strong anti cavitation performance, especially suitable for acidic, alkaline and corrosive media containing particle impurities. It has the advantages of high efficiency, energy saving, low noise and vibration, high reliability, and long service life, making it an ideal conveying equipment for chemical, acid washing, environmental protection, and sewage treatment.KJB耐腐耐颗粒夹板泵KJB耐腐耐颗粒夹板泵KJB corrosion-resistant and particle resistant clamp plate pump

图片关键词KJB耐腐耐颗粒夹板泵2. Four pole motor speed performance parametersKJB耐腐耐颗粒夹板泵

KJB耐腐耐颗粒夹板泵KJB耐腐耐颗粒夹板泵Installation and precautions: 1. Before installation, the pump and motor should be inspected, and all parts should be intact and free of debris inside the pump. 3. Place the unit on the foundation and place a pair of wedge pads between the base plate and the foundation. Adjust the high-speed pads to align the level of the pump. 5. When the pump inlet and outlet pipelines are rigid hard pipes connected to the pump, the center of the inlet and outlet pipelines should be aligned with the center of the pump inlet and outlet flanges, and expansion joints should be installed for soft connections. It is strictly prohibited to cause accidental damage by pulling or forcefully connecting import and export pipelines. 7. The phenomenon of parallel connection of pump inlet pipelines should be minimized as much as possible. If parallel connection is necessary, the number should not exceed two, and the cross-sectional area of parallel pipelines should be bolded according to the number of parallel connections. 9. To prevent debris from entering the pump, a filter should be installed at the inlet, with a filtration area greater than 3-4 times the cross-sectional area of the pipeline. 11. It is necessary to ensure that the cavitation allowance of the device is greater than that of the pump, and to consider pipeline losses and medium temperature. 12. When the medium temperature is too high, cooling measures should be taken for the mechanical seal to prevent deformation and cracking of the static ring. Instructions for starting, running, maintaining, and disassembling programs

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!