Medical clinic sewage treatment equipment
Name: Medical Clinic Sewage Treatment Equipment Before installing medical sewage treatment equipment, we should make preliminary preparations. The pre
Product details

Standard process for installation and construction of sewage treatment equipment in medical clinics
1. Before installing medical sewage treatment equipment, we should first make preparations. The preparation work in the early stage of hospital sewage treatment equipment construction is very important and is a prerequisite for ensuring the smooth progress of the project.
2. To be familiar with the drawings, construction technicians must be familiar with the technical requirements of personalized design in the construction drawings, understand and master the process flow and functional characteristics of each part of the device before construction.

3. To be familiar with technical specifications, the construction and installation of hospital sewage treatment projects should refer to relevant operating procedures and acceptance standards, as well as comply with the standard requirements of pipeline design specifications.
4. Understand the distribution of underground pipelines within the scope of earthwork layout, grasp the spacing, elevation, and interrelationships between the sewage treatment system, adjacent building foundations, and underground pipelines, and submit construction plans in accordance with regulatory requirements. After the completion of the construction plan, it shall be reviewed and approved by the construction party and the construction supervision unit.
5. Earthworks in construction engineering mainly include site leveling, excavation, backfilling, and compaction of foundation pits, roadbeds, and some special foundations. After the earthwork excavation plan is determined and approved, the cleaning and setting out can begin. Before excavation, the foundation pit should be marked with gray lines and level markers according to the axis installed on the gantry plate. For unsupported foundation pits, the slope width should be set out according to the specified requirements during laying out.