At present, there are numerous domestic enterprises producing automatic monitoring equipment, which has resulted in the inability of environmental management departments to effectively monitor and assess third-party operation and maintenance units in a unified and effective manner. The design of the operation and maintenance management system aims to improve the subjective initiative of third-party operation and maintenance units, the coordination ability of environmental management departments, ultimately reducing equipment failure rates, improving equipment online rates and data efficiency, enhancing early warning capabilities, and achieving automatic monitoring and monitoring of data to provide support services for energy conservation and emission reduction, pollution discharge fees, emergency command, etc. Innovate the assessment method by inspecting the daily maintenance work of third-party operation and maintenance units, including operation and maintenance records, quality control work, on-site instrument operation, on-site system operation, and water and electricity system operation environment.
1.0 Standard Mode: Daily Monitoring, Weekly Inspection, Weekly Verification, Monthly Comparison
2.0 Paperless Mode: Filling, Assessment, Positioning, and Statistics
3.0 Intelligent Mode: Intelligent Allocation, Fault Prediction and Scheduling, Multi dimensional Assessment
1. The purpose is to build a comprehensive information system that integrates basic information management for operation and maintenance, on-site ledger filling and recording, routine data analysis applications, intelligent allocation systems, and multi-dimensional operation and maintenance assessment system management.
2. According to the requirements of operation and maintenance assessment, the environmental supervision department can conduct comprehensive analysis of all operation and maintenance work every quarter to assess performance. The assessment content includes: data integrity rate and online rate, instrument online rate, failure rate, operation rate statistics, task statistics (total completion rate, timely completion rate), etc.
3. In addition, in terms of personnel assessment, indicators can be based on the completion status of maintenance tasks by maintenance personnel, including the number of tasks completed, the quality of task completion, and the timeliness of task completion.
4. Receive and confirm the tasks assigned by management personnel, and fill in the on-site work content. The filled in work content can be reviewed.
5. Realize the mapping of the obtained latitude and longitude data on the map, as well as the latest location of the operation and maintenance personnel, to ensure that operation and maintenance activities are carried out within an effective range.