Beijing Beiyanxing Electric Instrument Co., Ltd
Home>Products>Reference diagram for confined space operation site
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    18610092747
  • Address
    A4 Beiyanxing Company, Xinfeida Electronic Technology Industrial Development Center, Baisha Road, Shahe, Changping District, Beijing
Contact Now
Reference diagram for confined space operation site
Configuration List Number for Limited Space Sensory Projects
Product details

Configuration List of Limited Space Sensory Projects

Serial Number

Equipment name

quantity

unit

Specification requirements

1

Limited Space Training Platform

1

cover

The limited space homework real-life training platform is designed according to the needs, and can be used indoors or outdoors. The training platform has complete limited space homework function training.

long*wide*High:20rice*1.2rice*2rice

2

monitor system

1

cover

Real time monitoring of confined space work areas is necessary to understand the real-time work site of workers and respond to emergencies.

3

Accident simulation system

1

cover

The limited space operation accident simulation system is equipped with simulations of smoke, lighting, explosions, etc., to simulate the real scene.

4

Real time gas quality detection system

1

cover

It has the function of real-time monitoring of oxygen content, carbon dioxide concentration, carbon monoxide concentration, etc., and issuing alarms.


Temperature and humidity detection alarm system

1

cover

A device that converts temperature and humidity into electrical signals that are easy to measure and process. If the temperature and humidity exceed the standard, it can provide relevant alarm and reminder functions.

5

Escape detection system

1

cover

Trainees can perform real-time behavior detection by checking whether the escape route is correct and whether the correct escape route is taken in case of a fire.

6

Rescue tripod

2

individual

Tripod height134-214cm (adjustable)

Weight:18kg

Hanging height:1.3m

Larger lifting weight:140kg.

And install anti fall devices.

7

Strong ventilation equipment

2

cover

When ventilation is required in a poor working environment, strong ventilation or continuous ventilation equipment should be used.

Efficient ventilation design46000m3/h.

Low energy consumption and low power consumption.

Using special motors to improve efficiency, simplify structure, and reduce maintenance costs.

8

Gas mask, respirator

6

cover

Gas masks and respirators for escape, on-site construction, and rescue, with specifications and models configured according to requirements.

9

Mobile gas tester

6

tower

Handheld mobile gas tester with functions such as monitoring oxygen content, carbon dioxide concentration, carbon monoxide concentration, etc., and issuing alarms.

10

Other protective equipment

1

write instructions or comments on

Other protective equipment that needs to be configured during confined space operations, such as safety belts, safety ropes, rescue kits, etc., should be configured according to the requirements

11

Limited space homeworkVRsystem

1

cover

Supporting limited space assignments, training is conducted using a combination of virtual and real methods. By simulating typical limited space assignment scenarios, students can experience more realistic and typical limited space assignment training.


Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!