VIP member
Product details
Main technical parameters:
model | GK-25 (laboratory use) | GK-80 | GK-100 | GK-120 | GK-200 |
production capacity | 2-10 | 20-60 | 30-80 | 30-100 | 50-200 |
Roll size | 200X25 | 200X80 | 200X100 | 200X120 | 250X200 |
Roll pressure | 5X2 | 10X2 | 10X2 | 15X2 | 25X2 |
Roll speed | 2-20 (adjustable) | 2-20 (adjustable) | 2-20 (adjustable) | 2-20 (adjustable) | 2-20 (adjustable) |
feeding speed | 6-60 (adjustable) | 6-60 (adjustable) | 6-60 (adjustable) | 6-60 (adjustable) | 6-60 (adjustable) |
Roller drive motor | 2 | 4 | 7.5 | 10 | 15 |
Feeding drive motor | 1 | 1.5 | 2 | 2.2 | 3 |
Granulation | 0.1 | 1.1 | 2 | 2.2 | 3 |
oil pump | 0.2 | 0.75 | 1 | 1.1 | 2.2 |
Hydraulic system working pressure | 10 | 20 | 25 | 30 | 50 |
Roller and feeding speed adjustment type | Electromagnetic speed regulation/frequency conversion speed regulation | Electromagnetic speed regulation/frequency conversion speed regulation | Electromagnetic speed regulation/frequency conversion speed regulation | Electromagnetic speed regulation/frequency conversion speed regulation | Electromagnetic speed regulation/frequency conversion speed regulation |
【Main purpose:
1. Medicine: tablet granules, capsule filling granules, etc;
2. Food: granules for food manufacturing, seasoning granules, etc;
3. Plastic: Various plastic molding particles:
4. Chemical industry: particles such as catalysts, pigments, detergents, etc.
[Features]:
1. This machine is suitable for crushing and sorting particles in industries such as Western medicine, food, chemical pigments, and feed. After the particles with different shapes are sorted at this level, they can be eliminated through a mesh board to obtain particles with consistent shape and specifications.
2. All parts of this machine are made of stainless steel, with polished surfaces and easy assembly, disassembly, and cleaning.
[Service Commitment]:
Design and production
Our company extensively solicits opinions from the demand side during the design and production stages of equipment processing, especially in the layout of flat and vertical surfaces, fully considering the site conditions and public engineering conditions of the demand side, so as to ensure the quality of the equipment while optimizing the combination.
Installation and commissioning
When the equipment arrives at the buyer's factory, our company will send dedicated technical personnel to guide the installation and be responsible for debugging to normal use.
training
Before the equipment is used normally by the demand side, our company's debugging personnel will organize training for relevant personnel of the demand side. The training content includes equipment maintenance, upkeep, timely repair of common faults, and operating procedures for the equipment.
quality assurance
Our company's equipment warranty period is one year. During the warranty period, if the equipment is damaged due to non-human factors, we are responsible for free maintenance. If the equipment is damaged due to human factors, our company will promptly repair it and charge a cost fee.
Maintenance and Deadline
Equipment damage that occurs upon expiration of the warranty period shall be repaired on site within two days by enterprises within the province and within four days by enterprises outside the province upon receiving notification from the purchaser. The services provided upon expiration of the warranty period are paid services, and a production fee shall be charged for each service.
Service Commitment
Our company promises to provide lifelong guidance, maintenance, and service for all equipment.
Online inquiry