Jiangyin Shangdeli Machinery Co., Ltd
Home>Products>SDL-V high-efficiency mixer
SDL-V high-efficiency mixer
SDL-V high-efficiency mixer
Product details

[Technical Parameters]:

model
produce
capacity
Kg/time
Total volume of square meters
Mixed
time
power
kW
Cylinder
rotational speed
RPM
stir
rotational speed
RPM
External dimensions
(Length x Width x Height)
complete machine
weight
VI-300 120 0.3 10-20 1.1×2.2 12 500 2100×650×1850 450kg
VI-500 200 0.5 10-20 3×2.2 12 500 2700×800×2050 480kg
VI-1000 400 1 10-20 5.5×2.2 10 500 3000×1050×2450 950kg
VI-1500 600 1.5 10-20 7.5×3 10 500 3600×1100×3100 1020kg
VI-2000 850 2 10-20 7.5×4 10 350 4215×1280×3100 2000kg
VI-2500 1200 2.5 10-20 11×4 8 350 4260×1280×3200 2040kg
VI-3000 1500 3 10-20 11×5.5 8 350 4400×1300×3300 2500kg
VI-4000 1800 4 10-20 15×5.5 6 300 4800×1080×4200 3000kg
VI-6000 2500 6 10-20 18.5×7.5 5 300 5650×1300×4380 3800kg

[Main purpose]:
This machine is suitable for mixing dry material particles in pharmaceuticals and other industries.


[Machine Features]:
The mixing cylinder has a unique structure, high mixing efficiency, no dead corners, and uniform mixing.
Can be equipped with a vacuum suction device
For mixing materials with a certain amount of moisture, a forced mixing device (price to be discussed separately) can be added as shown in the above diagram with a mixing rod.


[Precautions for Operation]
1. The wiring operation should be carried out according to the circuit diagram. After connecting the wires, the equipment should be tested according to the indicator buttons on the control box panel. After confirming that there is no abnormal noise, the loading work can be carried out according to the operating procedures.
2. First, open one of the material ports in the mixing bin, load a certain amount of materials that need to be mixed, and then seal the lid;
3. Press the rotary start button, and the equipment will start working. After reaching the set rotation time, it will automatically stop. At this time, the rotation time can be determined on the time controller based on the mixing degree of the materials; According to different materials, the specific mixing time can be determined by oneself;
During the rotation of the equipment, water or liquid can be automatically sprayed into the mixing chamber, and the time and quantity can be automatically set and controlled according to requirements;
After reaching the required rotation time, the material can be released and enter the packaging or next process;
The effective volume of the mixed material is less than 70% of the total volume of the mixing bin.


[Service Commitment]:
Design and production
Our company extensively solicits opinions from the demand side during the design and production stages of equipment processing, especially in the layout of flat and vertical surfaces, fully considering the site conditions and public engineering conditions of the demand side, so as to ensure the quality of the equipment while optimizing the combination.
Installation and commissioning
When the equipment arrives at the buyer's factory, our company will send dedicated technical personnel to guide the installation and be responsible for debugging to normal use.
training
Before the equipment is used normally by the demand side, our company's debugging personnel will organize training for relevant personnel of the demand side. The training content includes equipment maintenance, upkeep, timely repair of common faults, and operating procedures for the equipment.
quality assurance
Our company's equipment warranty period is one year. During the warranty period, if the equipment is damaged due to non-human factors, we are responsible for free maintenance. If the equipment is damaged due to human factors, our company will promptly repair it and charge a cost fee.
Maintenance and Deadline
Equipment damage that occurs upon expiration of the warranty period shall be repaired on site within two days by enterprises within the province and within four days by enterprises outside the province upon receiving notification from the purchaser. The services provided upon expiration of the warranty period are paid services, and a production fee shall be charged for each service.
Service Commitment
Our company promises to provide lifelong guidance, maintenance, and service for all equipment.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!