Hebei Changda Environmental Protection Equipment Co., Ltd
Home>Products>Township hospital sewage treatment equipment
Township hospital sewage treatment equipment
The equipment composition of the sewage treatment plant in township hospitals includes feeding system, reaction system, control system, vacuum absorpt
Product details

The equipment composition of the sewage treatment plant in township hospitals includes feeding system, reaction system, control system, vacuum absorption system, and safety system.

Reaction principle: NaCLO3+2HCL=CLO2+1/2CL2+NaCL+H2O

Raw materials used: Sodium chlorate (GB/T1618-1995 industrial grade I, content ≥ 99%); Hydrochloric acid (GB320-93 industrial grade I, concentration ≥ 31%)

★ Produce composite disinfectants mainly composed of chlorine dioxide and supplemented by chlorine gas, with a CLO2 content greater than 70% based on effective chlorine.

★ Raw material transportation adopts metering pumps, which operate stably and measure accurately.

The internal reactor of the equipment is made of high-temperature and corrosion-resistant synthetic materials.

★ The total conversion rate of raw materials is ≥ 80%, with low energy consumption.

★ Add corresponding devices to achieve linkage with the water treatment system.

★ Adopting PT-100 controller, the temperature can be set arbitrarily, and the measured temperature can be displayed in a timely manner. It has over temperature alarm, metering pump start stop button, etc.

Raw material consumption: To produce 1 gram of effective chlorine, 0.65g of sodium chlorate and 1.3g of hydrochloric acid are consumed, equivalent to RMB 0.004.

Working principle of sewage treatment equipment in township hospitals:

The generator controls the metering pump through the control system to deliver two types of raw materials to the reaction kettle at a ratio of 1:1. The mixed liquid undergoes processes such as blowing off, venting, and heating. The power water is pumped out of the reaction kettle and mixed with chlorine dioxide through a water sprayer, and flows into the disinfection tank or sewage pipeline for contact

Our company adheres to the principle of "reputation first, customer first" and strives to provide excellent after-sales service.

1. Provide free training for users' operators and assist in developing equipment operating procedures.

2. Equipment repair within one year; Under normal use, the host is guaranteed for ten years.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!