Beijing Qianshun Longda Industry and Trade Co., Ltd
Home>Products>Welded ball stamping stainless steel water tank
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    13910393098
  • Address
    Kouzi Village South, Taihu Town, Tongzhou District, Beijing
Contact Now
Welded ball stamping stainless steel water tank
Welded ball stamping stainless steel water tank
Product details
1、 Overview
  The Qianshun brand series water tanks produced by our company are made of high-quality boards, which are made into single plates of different specifications
(1m x lm, lm x 0.5m, 0.5m x 0.5m), then proceed with assembly. Parameters related to this product
Based on the "Code for Design of Building Water Supply and Drainage" (GBJ15-88), this series of products is designed
The various hygiene indicators of the series of water tanks have been tested to meet the "Sanitary Standards for Drinking Water" GB5749-85. This series of water tanks has the advantages of flexible on-site assembly, low deformation, strong seismic resistance, and corrosion resistance
Advantages such as corrosion, easy cleaning, and long service life.

2、 Scope of application
  Mainly suitable for regulating building water supply, fire water tanks, storage water tanks, expansion and condensation water tanks for heating systems, temporary water tanks for building construction, road construction, geological exploration, and national defense projects. The water tank can store both cold and hot water, and is resistant to acid, alkali, seepage, leakage, deformation, and corrosion.
3、 Product classification

1Combination stainless steel water tank

2Combination enamel steel plate water tank

3Combination typeSMCwater tank


4、 Selection instructions

1When placing an order, the size of the water tank, the location of the connecting pipe, and the diameter of the pipe should be provided.

2The load of the water tank on the ground should be determined by the structural designer.

3When the water tank connection position provided by the user is exactly at the board joint, our company needs to adjust it while keeping the pipe diameter unchanged(Without further notice to users).


5、 Installation and acceptance

1During installation, leave no less than700A millimeter sized maintenance channel, with the top and bottom of the box not less than500Haomi.

2During civil construction, the support piers should be prepared first, and the connection joints between the unit plates at the bottom of the water tank should be located on the support piers.

3After assembly, close the outlet and drain pipes, open the water pipe, and check the water level while adding water until it is filled with water. If there is no water leakage for 24 hours, it is considered qualified.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!